Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP boundary report

Permit processing times in ZIP 60636

Across 2,751 issued permits assigned to ZIP 60636, the median processing time was 1 day.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2,7512021–Sep. 15, 2026

The short answer

For Permit processing times in ZIP 60636, 2,751 issued permit records show a median processing time of 1 day; 75% were issued within 13 days and 90% within 83 days, covering January 2021 through September 15, 2026.

Typical wait1 daymedian issued permit
Usually within13 days75% of records
Long-wait edge83 days90% of records
Evidence2,751issued permits

The median was 2.5 days slower than the previous 12 months.

Permit processing times in ZIP 60636: wait distribution

For Permit processing times in ZIP 60636, 2,751 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
49.0%
1–7 days
19.0%
8–30 days
13.2%
31–90 days
10.1%
91+ days
8.7%

Change over time

Permit processing times in ZIP 60636: annual permit timing

Permit processing times in ZIP 60636 has 6 publishable issue-year cohorts spanning 2021–2026, representing 2,751 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20215660 days7 days66 days
20225290 days3 days56 days
20234670 days4 days44 days
20244175 days28 days87 days
20254636 days26 days103 days
2026*3097 days48 days114 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Permit processing times in ZIP 60636: ZIP codes with similar overall timing

Permit processing times in ZIP 60636 has 2,751 issued records, a 1 day median, and a 13 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
606021 day10 days1,991
606031 day13 days1,858
606051 day16 days2,380
606091 day21 days3,840
606121 day25 days3,771
606171 day11 days4,812
606191 day12 days5,016
606201 day11 days5,084