Signs permits in ZIP 60636
The median signs permit wait in ZIP 60636 was 13 days, based on 99 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60636, 99 issued permit records show a median processing time of 13 days; 75% were issued within 35 days and 90% within 88 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60636: wait distribution
For Signs permits in ZIP 60636, 99 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60636: annual permit timing
Signs permits in ZIP 60636 has 5 publishable issue-year cohorts spanning 2021–2025, representing 92 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 21 | 5 days | 11 days | 66 days |
| 2022 | 16 | 7 days | 11 days | 28 days |
| 2023 | 21 | 1 day | 23 days | 37 days |
| 2024 | 17 | 29 days | 63 days | 88 days |
| 2025 | 17 | 21 days | 35 days | 113 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60636: Signs timing in comparable ZIP codes
Signs permits in ZIP 60636 has 99 issued records, a 13 days median, and a 35 days 75th-percentile wait in this release.
More Signs permits in ZIP 60636 comparisons
The Signs permits in ZIP 60636 cohort contains 99 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60636 permits ZIP reportSigns citywide Type report