ZIP code × permit type
Signs permits in ZIP 60612
The median signs permit wait in ZIP 60612 was 14 days, based on 238 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60612, 238 issued permit records show a median processing time of 14 days; 75% were issued within 50 days and 90% within 111 days, covering January 2021 through September 15, 2026.
The median was 11 days slower than the previous 12 months.
Signs permits in ZIP 60612: wait distribution
For Signs permits in ZIP 60612, 238 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60612: annual permit timing
Signs permits in ZIP 60612 has 6 publishable issue-year cohorts spanning 2021–2026, representing 238 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 51 | 6 days | 10 days | 78 days |
| 2022 | 53 | 3 days | 7 days | 33 days |
| 2023 | 21 | 7 days | 27 days | 132 days |
| 2024 | 44 | 50 days | 73 days | 174 days |
| 2025 | 57 | 19 days | 42 days | 79 days |
| 2026* | 12 | 111 days | 114 days | 120 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60612: Signs timing in comparable ZIP codes
Signs permits in ZIP 60612 has 238 issued records, a 14 days median, and a 50 days 75th-percentile wait in this release.