Signs permits in ZIP 60617
The median signs permit wait in ZIP 60617 was 13 days, based on 206 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60617, 206 issued permit records show a median processing time of 13 days; 75% were issued within 42 days and 90% within 105 days, covering January 2021 through September 15, 2026.
The median was 5 days faster than the previous 12 months.
Signs permits in ZIP 60617: wait distribution
For Signs permits in ZIP 60617, 206 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60617: annual permit timing
Signs permits in ZIP 60617 has 6 publishable issue-year cohorts spanning 2021–2026, representing 206 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 68 | 7 days | 11 days | 60 days |
| 2022 | 39 | 5 days | 10 days | 152 days |
| 2023 | 25 | 5 days | 15 days | 65 days |
| 2024 | 24 | 43 days | 47 days | 83 days |
| 2025 | 37 | 38 days | 96 days | 105 days |
| 2026* | 13 | 36 days | 59 days | 97 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60617: Signs timing in comparable ZIP codes
Signs permits in ZIP 60617 has 206 issued records, a 13 days median, and a 42 days 75th-percentile wait in this release.
More Signs permits in ZIP 60617 comparisons
The Signs permits in ZIP 60617 cohort contains 206 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60617 permits ZIP reportSigns citywide Type report