Signs permits in ZIP 60638

The median signs permit wait in ZIP 60638 was 13 days, based on 232 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2322021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60638, 232 issued permit records show a median processing time of 13 days; 75% were issued within 20 days and 90% within 63 days, covering January 2021 through September 15, 2026.

Typical wait13 daysmedian issued permit
Usually within20 days75% of records
Long-wait edge63 days90% of records
Evidence232issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60638: wait distribution

For Signs permits in ZIP 60638, 232 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
1.7%
1–7 days
37.5%
8–30 days
40.5%
31–90 days
13.8%
91+ days
6.5%

Change over time

Signs permits in ZIP 60638: annual permit timing

Signs permits in ZIP 60638 has 6 publishable issue-year cohorts spanning 2021–2026, representing 232 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021378 days21 days165 days
2022476 days14 days85 days
20238413 days22 days62 days
20243114 days16 days24 days
20252120 days29 days76 days
2026*1221 days32 days48 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60638: Signs timing in comparable ZIP codes

Signs permits in ZIP 60638 has 232 issued records, a 13 days median, and a 20 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061713 days42 days206
ZIP 6063613 days35 days99
ZIP 6063813 days20 days232
ZIP 6061214 days50 days238
ZIP 6062014 days37 days235
ZIP 6063214 days35 days433
ZIP 6063111 days26 days125
ZIP 6064315 days40 days184