Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60632

The median signs permit wait in ZIP 60632 was 14 days, based on 433 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked4332021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60632, 433 issued permit records show a median processing time of 14 days; 75% were issued within 35 days and 90% within 139 days, covering January 2021 through September 15, 2026.

Typical wait14 daysmedian issued permit
Usually within35 days75% of records
Long-wait edge139 days90% of records
Evidence433issued permits

The median was 17 days slower than the previous 12 months.

Signs permits in ZIP 60632: wait distribution

For Signs permits in ZIP 60632, 433 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.0%
1–7 days
30.5%
8–30 days
41.3%
31–90 days
14.5%
91+ days
13.6%

Change over time

Signs permits in ZIP 60632: annual permit timing

Signs permits in ZIP 60632 has 6 publishable issue-year cohorts spanning 2021–2026, representing 433 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20211048 days39 days205 days
2022966 days11 days100 days
2023395 days81 days121 days
20245919 days76 days167 days
20259122 days28 days43 days
2026*4433 days55 days88 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60632: Signs timing in comparable ZIP codes

Signs permits in ZIP 60632 has 433 issued records, a 14 days median, and a 35 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061214 days50 days238
ZIP 6062014 days37 days235
ZIP 6063214 days35 days433
ZIP 6061713 days42 days206
ZIP 6063613 days35 days99
ZIP 6063813 days20 days232
ZIP 6064315 days40 days184
ZIP 6065915 days46 days221