ZIP code × permit type

Signs permits in ZIP 60620

The median signs permit wait in ZIP 60620 was 14 days, based on 235 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2352021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60620, 235 issued permit records show a median processing time of 14 days; 75% were issued within 37 days and 90% within 77 days, covering January 2021 through September 15, 2026.

Typical wait14 daysmedian issued permit
Usually within37 days75% of records
Long-wait edge77 days90% of records
Evidence235issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60620: wait distribution

For Signs permits in ZIP 60620, 235 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
4.3%
1–7 days
34.9%
8–30 days
29.8%
31–90 days
24.3%
91+ days
6.8%

Change over time

Signs permits in ZIP 60620: annual permit timing

Signs permits in ZIP 60620 has 6 publishable issue-year cohorts spanning 2021–2026, representing 235 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021696 days12 days27 days
2022468.5 days20 days54 days
2023324 days33 days55 days
20241948 days132 days174 days
20254130 days40 days106 days
2026*2834 days74 days76 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60620: Signs timing in comparable ZIP codes

Signs permits in ZIP 60620 has 235 issued records, a 14 days median, and a 37 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061214 days50 days238
ZIP 6062014 days37 days235
ZIP 6063214 days35 days433
ZIP 6061713 days42 days206
ZIP 6063613 days35 days99
ZIP 6063813 days20 days232
ZIP 6064315 days40 days184
ZIP 6065915 days46 days221