Signs permits in ZIP 60643
The median signs permit wait in ZIP 60643 was 15 days, based on 184 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60643, 184 issued permit records show a median processing time of 15 days; 75% were issued within 40 days and 90% within 141 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60643: wait distribution
For Signs permits in ZIP 60643, 184 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60643: annual permit timing
Signs permits in ZIP 60643 has 6 publishable issue-year cohorts spanning 2021–2026, representing 184 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 43 | 7 days | 10 days | 77 days |
| 2022 | 45 | 6 days | 68 days | 117 days |
| 2023 | 24 | 1 day | 10 days | 33 days |
| 2024 | 34 | 23 days | 36 days | 87 days |
| 2025 | 22 | 26 days | 159 days | 207 days |
| 2026* | 16 | 29 days | 78 days | 240 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60643: Signs timing in comparable ZIP codes
Signs permits in ZIP 60643 has 184 issued records, a 15 days median, and a 40 days 75th-percentile wait in this release.
More Signs permits in ZIP 60643 comparisons
The Signs permits in ZIP 60643 cohort contains 184 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60643 permits ZIP reportSigns citywide Type report