Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60630

The median signs permit wait in ZIP 60630 was 16 days, based on 217 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2172021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60630, 217 issued permit records show a median processing time of 16 days; 75% were issued within 43 days and 90% within 74 days, covering January 2021 through September 15, 2026.

Typical wait16 daysmedian issued permit
Usually within43 days75% of records
Long-wait edge74 days90% of records
Evidence217issued permits

The median was 16 days faster than the previous 12 months.

Signs permits in ZIP 60630: wait distribution

For Signs permits in ZIP 60630, 217 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
6.0%
1–7 days
30.9%
8–30 days
28.6%
31–90 days
28.6%
91+ days
6.0%

Change over time

Signs permits in ZIP 60630: annual permit timing

Signs permits in ZIP 60630 has 6 publishable issue-year cohorts spanning 2021–2026, representing 217 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20211916 days35 days58 days
2022576 days7 days22 days
2023475 days20 days56 days
20244341 days65 days65 days
20253438 days52 days81 days
2026*1730 days40 days235 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60630: Signs timing in comparable ZIP codes

Signs permits in ZIP 60630 has 217 issued records, a 16 days median, and a 43 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6062116 days54 days82
ZIP 6062616 days52 days172
ZIP 6063016 days43 days217
ZIP 6063916 days49 days274
ZIP 6064216 days49 days512
ZIP 6064315 days40 days184
ZIP 6065117 days41 days186
ZIP 6065915 days46 days221