Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60642

The median signs permit wait in ZIP 60642 was 16 days, based on 512 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked5122021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60642, 512 issued permit records show a median processing time of 16 days; 75% were issued within 49 days and 90% within 137 days, covering January 2021 through September 15, 2026.

Typical wait16 daysmedian issued permit
Usually within49 days75% of records
Long-wait edge137 days90% of records
Evidence512issued permits

The median was 7 days slower than the previous 12 months.

Signs permits in ZIP 60642: wait distribution

For Signs permits in ZIP 60642, 512 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
2.3%
1–7 days
28.9%
8–30 days
34.0%
31–90 days
20.5%
91+ days
14.3%

Change over time

Signs permits in ZIP 60642: annual permit timing

Signs permits in ZIP 60642 has 6 publishable issue-year cohorts spanning 2021–2026, representing 512 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021677 days49 days77 days
20221097 days134 days185 days
2023951 day16 days35 days
20246630 days42 days166 days
20258219 days65 days118 days
2026*9329 days49 days88 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60642: Signs timing in comparable ZIP codes

Signs permits in ZIP 60642 has 512 issued records, a 16 days median, and a 49 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6064216 days49 days512
ZIP 6062116 days54 days82
ZIP 6062616 days52 days172
ZIP 6063016 days43 days217
ZIP 6065117 days41 days186
ZIP 6063916 days49 days274
ZIP 6064315 days40 days184
ZIP 6065915 days46 days221