Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60651

The median signs permit wait in ZIP 60651 was 17 days, based on 186 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1862021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60651, 186 issued permit records show a median processing time of 17 days; 75% were issued within 41 days and 90% within 91 days, covering January 2021 through September 15, 2026.

Typical wait17 daysmedian issued permit
Usually within41 days75% of records
Long-wait edge91 days90% of records
Evidence186issued permits

The median was 10 days slower than the previous 12 months.

Signs permits in ZIP 60651: wait distribution

For Signs permits in ZIP 60651, 186 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
3.8%
1–7 days
34.9%
8–30 days
28.5%
31–90 days
21.5%
91+ days
11.3%

Change over time

Signs permits in ZIP 60651: annual permit timing

Signs permits in ZIP 60651 has 6 publishable issue-year cohorts spanning 2021–2026, representing 186 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20212634 days91 days160 days
2022366 days15 days66 days
2023416 days6 days50 days
20241820 days34 days50 days
20254522 days47 days57 days
2026*2032 days72 days102 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60651: Signs timing in comparable ZIP codes

Signs permits in ZIP 60651 has 186 issued records, a 17 days median, and a 41 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6065117 days41 days186
ZIP 6064216 days49 days512
ZIP 6062116 days54 days82
ZIP 6062616 days52 days172
ZIP 6063016 days43 days217
ZIP 6070718 days51 days199
ZIP 6063916 days49 days274
ZIP 6064315 days40 days184