Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60707

The median signs permit wait in ZIP 60707 was 18 days, based on 199 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1992021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60707, 199 issued permit records show a median processing time of 18 days; 75% were issued within 51 days and 90% within 173 days, covering January 2021 through September 15, 2026.

Typical wait18 daysmedian issued permit
Usually within51 days75% of records
Long-wait edge173 days90% of records
Evidence199issued permits

The median was 132 days slower than the previous 12 months.

Signs permits in ZIP 60707: wait distribution

For Signs permits in ZIP 60707, 199 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.5%
1–7 days
30.2%
8–30 days
30.7%
31–90 days
20.1%
91+ days
18.6%

Change over time

Signs permits in ZIP 60707: annual permit timing

Signs permits in ZIP 60707 has 6 publishable issue-year cohorts spanning 2021–2026, representing 199 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021148 days49 days69 days
2022475 days19 days84 days
2023301 day5.2 days22 days
20241912 days33 days42 days
20257748 days167 days173 days
2026*1249 days163 days168 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60707: Signs timing in comparable ZIP codes

Signs permits in ZIP 60707 has 199 issued records, a 18 days median, and a 51 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6070718 days51 days199
ZIP 6065117 days41 days186
ZIP 6064216 days49 days512
ZIP 6060920 days79 days217
ZIP 6061820 days51 days601
ZIP 6062116 days54 days82
ZIP 6062616 days52 days172
ZIP 6063016 days43 days217