ZIP boundary report
Permit processing times in ZIP 60707
Across 1,289 issued permits assigned to ZIP 60707, the median processing time was 2 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60707, 1,289 issued permit records show a median processing time of 2 days; 75% were issued within 14 days and 90% within 64 days, covering January 2021 through September 15, 2026.
The median was 2 days slower than the previous 12 months.
Permit processing times in ZIP 60707: wait distribution
For Permit processing times in ZIP 60707, 1,289 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60707: annual permit timing
Permit processing times in ZIP 60707 has 6 publishable issue-year cohorts spanning 2021–2026, representing 1,289 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 265 | 0 days | 5 days | 48 days |
| 2022 | 252 | 0 days | 9.2 days | 54 days |
| 2023 | 196 | 0 days | 8.2 days | 22 days |
| 2024 | 226 | 5.5 days | 16 days | 52 days |
| 2025 | 225 | 12 days | 48 days | 167 days |
| 2026* | 125 | 5 days | 18 days | 88 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60707: ZIP codes with similar overall timing
Permit processing times in ZIP 60707 has 1,289 issued records, a 2 days median, and a 14 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60707 comparisons
The Permit processing times in ZIP 60707 cohort contains 1,289 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayEasy Permit Process 0 daysSigns 18 daysRenovation & Alteration 43 daysNew Construction 53 days