Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

New Construction permits in ZIP 60707

The median new construction permit wait in ZIP 60707 was 53 days, based on 37 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked372021–Sep. 15, 2026

The short answer

For New Construction permits in ZIP 60707, 37 issued permit records show a median processing time of 53 days; 75% were issued within 156 days and 90% within 259 days, covering January 2021 through September 15, 2026.

Typical wait53 daysmedian issued permit
Usually within156 days75% of records
Long-wait edge259 days90% of records
Evidence37issued permits

Not enough records for a year-over-year comparison.

New Construction permits in ZIP 60707: wait distribution

For New Construction permits in ZIP 60707, 37 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
10.8%
1–7 days
18.9%
8–30 days
13.5%
31–90 days
21.6%
91+ days
35.1%

Change over time

New Construction permits in ZIP 60707: annual permit timing

New Construction permits in ZIP 60707 has 1 publishable issue-year cohorts spanning 2024–2024, representing 12 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
202412154 days245 days275 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

New Construction permits in ZIP 60707: New Construction timing in comparable ZIP codes

New Construction permits in ZIP 60707 has 37 issued records, a 53 days median, and a 156 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6063953 days119 days55
ZIP 6065353 days110 days214
ZIP 6070753 days156 days37
ZIP 6061552 days85 days154
ZIP 6064154 days124 days130
ZIP 6062452 days101 days162
ZIP 6065552 days103 days38
ZIP 6063252 days120 days122