ZIP boundary report
Permit processing times in ZIP 60624
Across 2,944 issued permits assigned to ZIP 60624, the median processing time was 2 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60624, 2,944 issued permit records show a median processing time of 2 days; 75% were issued within 21 days and 90% within 86 days, covering January 2021 through September 15, 2026.
The median was unchanged from the previous 12 months.
Permit processing times in ZIP 60624: wait distribution
For Permit processing times in ZIP 60624, 2,944 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60624: annual permit timing
Permit processing times in ZIP 60624 has 6 publishable issue-year cohorts spanning 2021–2026, representing 2,944 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 574 | 0 days | 6 days | 59 days |
| 2022 | 576 | 0 days | 5 days | 64 days |
| 2023 | 465 | 0 days | 8 days | 62 days |
| 2024 | 471 | 7 days | 42 days | 113 days |
| 2025 | 513 | 8 days | 43 days | 91 days |
| 2026* | 345 | 7 days | 48 days | 109 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60624: ZIP codes with similar overall timing
Permit processing times in ZIP 60624 has 2,944 issued records, a 2 days median, and a 21 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60624 comparisons
The Permit processing times in ZIP 60624 cohort contains 2,944 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayRenovation & Alteration 34 daysEasy Permit Process 0 daysNew Construction 52 daysSigns 32 daysWrecking & Demolition 0 daysElevator Equipment 0 daysReinstated Permit 0 days