Signs permits in ZIP 60624
The median signs permit wait in ZIP 60624 was 32 days, based on 99 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60624, 99 issued permit records show a median processing time of 32 days; 75% were issued within 78 days and 90% within 144 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60624: wait distribution
For Signs permits in ZIP 60624, 99 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60624: annual permit timing
Signs permits in ZIP 60624 has 4 publishable issue-year cohorts spanning 2021–2025, representing 85 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 25 | 9 days | 49 days | 142 days |
| 2023 | 24 | 3 days | 7.8 days | 32 days |
| 2024 | 23 | 76 days | 85 days | 217 days |
| 2025 | 13 | 53 days | 82 days | 91 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60624: Signs timing in comparable ZIP codes
Signs permits in ZIP 60624 has 99 issued records, a 32 days median, and a 78 days 75th-percentile wait in this release.
More Signs permits in ZIP 60624 comparisons
The Signs permits in ZIP 60624 cohort contains 99 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60624 permits ZIP reportSigns citywide Type report