Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60654

The median signs permit wait in ZIP 60654 was 32 days, based on 465 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked4652021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60654, 465 issued permit records show a median processing time of 32 days; 75% were issued within 91 days and 90% within 187 days, covering January 2021 through September 15, 2026.

Typical wait32 daysmedian issued permit
Usually within91 days75% of records
Long-wait edge187 days90% of records
Evidence465issued permits

The median was 27 days slower than the previous 12 months.

Signs permits in ZIP 60654: wait distribution

For Signs permits in ZIP 60654, 465 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.2%
1–7 days
15.9%
8–30 days
32.3%
31–90 days
26.5%
91+ days
25.2%

Change over time

Signs permits in ZIP 60654: annual permit timing

Signs permits in ZIP 60654 has 6 publishable issue-year cohorts spanning 2021–2026, representing 465 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20218418 days79 days140 days
20229819 days95 days248 days
20237928 days98 days161 days
20248345 days114 days169 days
20256029 days68 days103 days
2026*6170 days177 days302 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60654: Signs timing in comparable ZIP codes

Signs permits in ZIP 60654 has 465 issued records, a 32 days median, and a 91 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061432 days76 days709
ZIP 6062432 days78 days99
ZIP 6065432 days91 days465
ZIP 6060732 days81 days812
ZIP 6061034 days59 days379
ZIP 6061130 days63 days572
ZIP 6062930 days81 days209
ZIP 6061629 days74 days205