ZIP code × permit type
Signs permits in ZIP 60629
The median signs permit wait in ZIP 60629 was 30 days, based on 209 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60629, 209 issued permit records show a median processing time of 30 days; 75% were issued within 81 days and 90% within 195 days, covering January 2021 through September 15, 2026.
The median was 21 days slower than the previous 12 months.
Signs permits in ZIP 60629: wait distribution
For Signs permits in ZIP 60629, 209 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60629: annual permit timing
Signs permits in ZIP 60629 has 6 publishable issue-year cohorts spanning 2021–2026, representing 209 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 33 | 49 days | 182 days | 438 days |
| 2022 | 39 | 15 days | 34 days | 87 days |
| 2023 | 19 | 146 days | 230 days | 255 days |
| 2024 | 68 | 30 days | 78 days | 180 days |
| 2025 | 34 | 22 days | 52 days | 95 days |
| 2026* | 16 | 74 days | 114 days | 185 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60629: Signs timing in comparable ZIP codes
Signs permits in ZIP 60629 has 209 issued records, a 30 days median, and a 81 days 75th-percentile wait in this release.
More Signs permits in ZIP 60629 comparisons
The Signs permits in ZIP 60629 cohort contains 209 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60629 permits ZIP reportSigns citywide Type report