Signs permits in ZIP 60657
The median signs permit wait in ZIP 60657 was 29 days, based on 559 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60657, 559 issued permit records show a median processing time of 29 days; 75% were issued within 64 days and 90% within 152 days, covering January 2021 through September 15, 2026.
The median was 8 days slower than the previous 12 months.
Signs permits in ZIP 60657: wait distribution
For Signs permits in ZIP 60657, 559 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60657: annual permit timing
Signs permits in ZIP 60657 has 6 publishable issue-year cohorts spanning 2021–2026, representing 559 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 106 | 30 days | 114 days | 210 days |
| 2022 | 119 | 11 days | 45 days | 151 days |
| 2023 | 86 | 24 days | 63 days | 142 days |
| 2024 | 89 | 29 days | 91 days | 121 days |
| 2025 | 98 | 29 days | 46 days | 92 days |
| 2026* | 61 | 33 days | 84 days | 208 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60657: Signs timing in comparable ZIP codes
Signs permits in ZIP 60657 has 559 issued records, a 29 days median, and a 64 days 75th-percentile wait in this release.
More Signs permits in ZIP 60657 comparisons
The Signs permits in ZIP 60657 cohort contains 559 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60657 permits ZIP reportSigns citywide Type report