Signs permits in ZIP 60615
The median signs permit wait in ZIP 60615 was 27 days, based on 131 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60615, 131 issued permit records show a median processing time of 27 days; 75% were issued within 89 days and 90% within 196 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60615: wait distribution
For Signs permits in ZIP 60615, 131 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60615: annual permit timing
Signs permits in ZIP 60615 has 6 publishable issue-year cohorts spanning 2021–2026, representing 131 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 24 | 44 days | 197 days | 315 days |
| 2022 | 19 | 22 days | 27 days | 173 days |
| 2023 | 16 | 18 days | 64 days | 407 days |
| 2024 | 20 | 53 days | 99 days | 111 days |
| 2025 | 37 | 41 days | 126 days | 175 days |
| 2026* | 15 | 42 days | 80 days | 99 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60615: Signs timing in comparable ZIP codes
Signs permits in ZIP 60615 has 131 issued records, a 27 days median, and a 89 days 75th-percentile wait in this release.
More Signs permits in ZIP 60615 comparisons
The Signs permits in ZIP 60615 cohort contains 131 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60615 permits ZIP reportSigns citywide Type report