Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60647

The median signs permit wait in ZIP 60647 was 27 days, based on 411 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked4112021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60647, 411 issued permit records show a median processing time of 27 days; 75% were issued within 58 days and 90% within 132 days, covering January 2021 through September 15, 2026.

Typical wait27 daysmedian issued permit
Usually within58 days75% of records
Long-wait edge132 days90% of records
Evidence411issued permits

The median was 9.5 days faster than the previous 12 months.

Signs permits in ZIP 60647: wait distribution

For Signs permits in ZIP 60647, 411 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
1.0%
1–7 days
22.4%
8–30 days
31.4%
31–90 days
30.9%
91+ days
14.4%

Change over time

Signs permits in ZIP 60647: annual permit timing

Signs permits in ZIP 60647 has 6 publishable issue-year cohorts spanning 2021–2026, representing 411 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20216045 days100 days184 days
2022828 days13 days75 days
2023849 days46 days75 days
20247934 days58 days82 days
20256639 days66 days171 days
2026*4028 days60 days93 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60647: Signs timing in comparable ZIP codes

Signs permits in ZIP 60647 has 411 issued records, a 27 days median, and a 58 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061527 days89 days131
ZIP 6064727 days58 days411
ZIP 6061326 days67 days224
ZIP 6061926 days42 days144
ZIP 6063728 days63 days94
ZIP 6064928 days69 days40
ZIP 6061629 days74 days205
ZIP 6062229 days84 days331