ZIP code × permit type
Signs permits in ZIP 60649
The median signs permit wait in ZIP 60649 was 28 days, based on 40 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60649, 40 issued permit records show a median processing time of 28 days; 75% were issued within 69 days and 90% within 179 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60649: wait distribution
For Signs permits in ZIP 60649, 40 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60649: annual permit timing
Signs permits in ZIP 60649 has 1 publishable issue-year cohorts spanning 2024–2024, representing 19 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2024 | 19 | 19 days | 112 days | 179 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60649: Signs timing in comparable ZIP codes
Signs permits in ZIP 60649 has 40 issued records, a 28 days median, and a 69 days 75th-percentile wait in this release.
More Signs permits in ZIP 60649 comparisons
The Signs permits in ZIP 60649 cohort contains 40 issued records; related links retain separate location and permit-category cohorts.