ZIP code × permit type
Signs permits in ZIP 60613
The median signs permit wait in ZIP 60613 was 26 days, based on 224 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60613, 224 issued permit records show a median processing time of 26 days; 75% were issued within 67 days and 90% within 144 days, covering January 2021 through September 15, 2026.
The median was 12 days slower than the previous 12 months.
Signs permits in ZIP 60613: wait distribution
For Signs permits in ZIP 60613, 224 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60613: annual permit timing
Signs permits in ZIP 60613 has 6 publishable issue-year cohorts spanning 2021–2026, representing 224 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 41 | 74 days | 149 days | 310 days |
| 2022 | 40 | 13 days | 42 days | 68 days |
| 2023 | 31 | 14 days | 21 days | 35 days |
| 2024 | 58 | 22 days | 45 days | 93 days |
| 2025 | 37 | 37 days | 49 days | 109 days |
| 2026* | 17 | 41 days | 77 days | 117 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60613: Signs timing in comparable ZIP codes
Signs permits in ZIP 60613 has 224 issued records, a 26 days median, and a 67 days 75th-percentile wait in this release.
More Signs permits in ZIP 60613 comparisons
The Signs permits in ZIP 60613 cohort contains 224 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60613 permits ZIP reportSigns citywide Type report