ZIP code × permit type

Signs permits in ZIP 60619

The median signs permit wait in ZIP 60619 was 26 days, based on 144 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1442021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60619, 144 issued permit records show a median processing time of 26 days; 75% were issued within 42 days and 90% within 122 days, covering January 2021 through September 15, 2026.

Typical wait26 daysmedian issued permit
Usually within42 days75% of records
Long-wait edge122 days90% of records
Evidence144issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60619: wait distribution

For Signs permits in ZIP 60619, 144 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
2.1%
1–7 days
25.7%
8–30 days
34.7%
31–90 days
22.9%
91+ days
14.6%

Change over time

Signs permits in ZIP 60619: annual permit timing

Signs permits in ZIP 60619 has 6 publishable issue-year cohorts spanning 2021–2026, representing 144 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021187 days70 days114 days
2022164.5 days30 days204 days
2023323 days28 days109 days
20242426 days30 days61 days
20254032 days45 days147 days
2026*1440 days47 days48 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60619: Signs timing in comparable ZIP codes

Signs permits in ZIP 60619 has 144 issued records, a 26 days median, and a 42 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061326 days67 days224
ZIP 6061926 days42 days144
ZIP 6061527 days89 days131
ZIP 6064727 days58 days411
ZIP 6063728 days63 days94
ZIP 6064024 days62 days326
ZIP 6064928 days69 days40
ZIP 6065324 days50 days80