Signs permits in ZIP 60653
The median signs permit wait in ZIP 60653 was 24 days, based on 80 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60653, 80 issued permit records show a median processing time of 24 days; 75% were issued within 50 days and 90% within 125 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60653: wait distribution
For Signs permits in ZIP 60653, 80 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60653: annual permit timing
Signs permits in ZIP 60653 has 4 publishable issue-year cohorts spanning 2021–2026, representing 68 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 16 | 52 days | 96 days | 400 days |
| 2022 | 27 | 6 days | 13 days | 38 days |
| 2024 | 10 | 40 days | 109 days | 303 days |
| 2026* | 15 | 31 days | 48 days | 103 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60653: Signs timing in comparable ZIP codes
Signs permits in ZIP 60653 has 80 issued records, a 24 days median, and a 50 days 75th-percentile wait in this release.
More Signs permits in ZIP 60653 comparisons
The Signs permits in ZIP 60653 cohort contains 80 issued records; related links retain separate location and permit-category cohorts.