Signs permits in ZIP 60606
The median signs permit wait in ZIP 60606 was 22 days, based on 165 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60606, 165 issued permit records show a median processing time of 22 days; 75% were issued within 43 days and 90% within 94 days, covering January 2021 through September 15, 2026.
The median was 4.5 days faster than the previous 12 months.
Signs permits in ZIP 60606: wait distribution
For Signs permits in ZIP 60606, 165 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60606: annual permit timing
Signs permits in ZIP 60606 has 6 publishable issue-year cohorts spanning 2021–2026, representing 165 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 26 | 24 days | 47 days | 136 days |
| 2022 | 33 | 15 days | 40 days | 77 days |
| 2023 | 21 | 10 days | 28 days | 54 days |
| 2024 | 26 | 29 days | 56 days | 94 days |
| 2025 | 32 | 21 days | 40 days | 45 days |
| 2026* | 27 | 43 days | 50 days | 127 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60606: Signs timing in comparable ZIP codes
Signs permits in ZIP 60606 has 165 issued records, a 22 days median, and a 43 days 75th-percentile wait in this release.
More Signs permits in ZIP 60606 comparisons
The Signs permits in ZIP 60606 cohort contains 165 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60606 permits ZIP reportSigns citywide Type report