Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60634

The median signs permit wait in ZIP 60634 was 21 days, based on 131 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1312021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60634, 131 issued permit records show a median processing time of 21 days; 75% were issued within 38 days and 90% within 105 days, covering January 2021 through September 15, 2026.

Typical wait21 daysmedian issued permit
Usually within38 days75% of records
Long-wait edge105 days90% of records
Evidence131issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60634: wait distribution

For Signs permits in ZIP 60634, 131 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.0%
1–7 days
28.2%
8–30 days
36.6%
31–90 days
22.1%
91+ days
13.0%

Change over time

Signs permits in ZIP 60634: annual permit timing

Signs permits in ZIP 60634 has 5 publishable issue-year cohorts spanning 2021–2025, representing 124 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20211242 days173 days182 days
2022455 days13 days60 days
20232728 days36 days48 days
20242026 days37 days101 days
20252034 days58 days105 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60634: Signs timing in comparable ZIP codes

Signs permits in ZIP 60634 has 131 issued records, a 21 days median, and a 38 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6062821 days71 days115
ZIP 6063421 days38 days131
ZIP 6065521 days42 days83
ZIP 6066121 days44 days145
ZIP 6064522 days48 days114
ZIP 6060622 days43 days165
ZIP 6060822 days64 days343
ZIP 6060920 days79 days217