Signs permits in ZIP 60608
The median signs permit wait in ZIP 60608 was 22 days, based on 343 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60608, 343 issued permit records show a median processing time of 22 days; 75% were issued within 64 days and 90% within 141 days, covering January 2021 through September 15, 2026.
The median was 7 days faster than the previous 12 months.
Signs permits in ZIP 60608: wait distribution
For Signs permits in ZIP 60608, 343 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60608: annual permit timing
Signs permits in ZIP 60608 has 6 publishable issue-year cohorts spanning 2021–2026, representing 343 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 73 | 9 days | 30 days | 111 days |
| 2022 | 81 | 6 days | 27 days | 150 days |
| 2023 | 35 | 3 days | 39 days | 242 days |
| 2024 | 68 | 36 days | 80 days | 166 days |
| 2025 | 44 | 35 days | 69 days | 104 days |
| 2026* | 42 | 44 days | 132 days | 254 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60608: Signs timing in comparable ZIP codes
Signs permits in ZIP 60608 has 343 issued records, a 22 days median, and a 64 days 75th-percentile wait in this release.
More Signs permits in ZIP 60608 comparisons
The Signs permits in ZIP 60608 cohort contains 343 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60608 permits ZIP reportSigns citywide Type report