Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60623

The median signs permit wait in ZIP 60623 was 22 days, based on 191 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1912021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60623, 191 issued permit records show a median processing time of 22 days; 75% were issued within 57 days and 90% within 145 days, covering January 2021 through September 15, 2026.

Typical wait22 daysmedian issued permit
Usually within57 days75% of records
Long-wait edge145 days90% of records
Evidence191issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60623: wait distribution

For Signs permits in ZIP 60623, 191 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.0%
1–7 days
33.5%
8–30 days
27.2%
31–90 days
24.6%
91+ days
14.7%

Change over time

Signs permits in ZIP 60623: annual permit timing

Signs permits in ZIP 60623 has 6 publishable issue-year cohorts spanning 2021–2026, representing 191 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021345 days132 days250 days
2022284 days6.2 days130 days
2023411 day36 days78 days
20243833 days69 days152 days
20253630 days48 days71 days
2026*1422 days33 days63 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60623: Signs timing in comparable ZIP codes

Signs permits in ZIP 60623 has 191 issued records, a 22 days median, and a 57 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6060622 days43 days165
ZIP 6060822 days64 days343
ZIP 6062322 days57 days191
ZIP 6064522 days48 days114
ZIP 6062821 days71 days115
ZIP 6063421 days38 days131
ZIP 6064423 days65 days85
ZIP 6065521 days42 days83