ZIP code × permit type
Signs permits in ZIP 60644
The median signs permit wait in ZIP 60644 was 23 days, based on 85 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60644, 85 issued permit records show a median processing time of 23 days; 75% were issued within 65 days and 90% within 223 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60644: wait distribution
For Signs permits in ZIP 60644, 85 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60644: annual permit timing
Signs permits in ZIP 60644 has 4 publishable issue-year cohorts spanning 2021–2025, representing 75 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 25 | 8 days | 90 days | 325 days |
| 2023 | 11 | 6 days | 28 days | 74 days |
| 2024 | 16 | 36 days | 49 days | 114 days |
| 2025 | 23 | 23 days | 30 days | 43 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60644: Signs timing in comparable ZIP codes
Signs permits in ZIP 60644 has 85 issued records, a 23 days median, and a 65 days 75th-percentile wait in this release.
More Signs permits in ZIP 60644 comparisons
The Signs permits in ZIP 60644 cohort contains 85 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60644 permits ZIP reportSigns citywide Type report