Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP boundary report

Permit processing times in ZIP 60623

Across 4,182 issued permits assigned to ZIP 60623, the median processing time was 2 days.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked4,1822021–Sep. 15, 2026

The short answer

For Permit processing times in ZIP 60623, 4,182 issued permit records show a median processing time of 2 days; 75% were issued within 24 days and 90% within 98 days, covering January 2021 through September 15, 2026.

Typical wait2 daysmedian issued permit
Usually within24 days75% of records
Long-wait edge98 days90% of records
Evidence4,182issued permits

The median was unchanged from the previous 12 months.

Permit processing times in ZIP 60623: wait distribution

For Permit processing times in ZIP 60623, 4,182 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
43.4%
1–7 days
20.0%
8–30 days
14.1%
31–90 days
11.7%
91+ days
10.8%

Change over time

Permit processing times in ZIP 60623: annual permit timing

Permit processing times in ZIP 60623 has 6 publishable issue-year cohorts spanning 2021–2026, representing 4,182 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20218090 days7 days70 days
20228170 days4 days54 days
20236880 days13 days93 days
20246737 days41 days109 days
20257139 days51 days151 days
2026*48211 days45 days128 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Permit processing times in ZIP 60623: ZIP codes with similar overall timing

Permit processing times in ZIP 60623 has 4,182 issued records, a 2 days median, and a 24 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
606062 days15 days6,775
606082 days26 days4,677
606132 days21 days2,994
606162 days25 days2,939
606182 days27 days6,576
606212 days23 days2,516
606232 days24 days4,182
606242 days21 days2,944