Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

New Construction permits in ZIP 60623

The median new construction permit wait in ZIP 60623 was 45 days, based on 253 issued records.

Records checked2532021–Sep. 15, 2026

The short answer

Typical wait45 daysmedian issued permit
Usually within146 days75% of records
Long-wait edge208 days90% of records
Evidence253issued permits

The median was 88 days faster than the previous 12 months.

How the waits are distributed

Median is only the middle. This shows how often issued permits fell into each elapsed-time band.

Same day
24.9%
1–7 days
15.0%
8–30 days
6.3%
31–90 days
20.9%
91+ days
32.8%

Change over time

Annual permit timing

Issue yearRecordsMedian75th percentile90th percentile
2021260 days0.8 days71 days
2022440 days0 days151 days
2023388 days109 days227 days
20243048 days128 days242 days
202574148 days160 days221 days
2026*4146 days81 days137 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

New Construction timing in comparable ZIP codes

ReportMedian75% withinRecords
ZIP 6061845 days86 days503
ZIP 6062345 days146 days253
ZIP 6061944 days108 days43
ZIP 6062142 days137 days36
ZIP 6061648 days128 days190
ZIP 6064648 days146 days42
ZIP 6064742 days105 days322
ZIP 6062941 days116 days45