ZIP code × permit type
New Construction permits in ZIP 60647
The median new construction permit wait in ZIP 60647 was 42 days, based on 322 issued records.
Records checked3222021–Sep. 15, 2026
The short answer
Typical wait42 daysmedian issued permit
Usually within105 days75% of records
Long-wait edge226 days90% of records
Evidence322issued permits
The median was 8.5 days faster than the previous 12 months.
How the waits are distributed
Median is only the middle. This shows how often issued permits fell into each elapsed-time band.
Change over time
Annual permit timing
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 72 | 3 days | 75 days | 177 days |
| 2022 | 61 | 0 days | 54 days | 133 days |
| 2023 | 43 | 25 days | 101 days | 212 days |
| 2024 | 49 | 62 days | 151 days | 220 days |
| 2025 | 52 | 55 days | 103 days | 251 days |
| 2026* | 45 | 68 days | 157 days | 362 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.