ZIP boundary report
Permit processing times in ZIP 60647
Across 5,611 issued permits assigned to ZIP 60647, the median processing time was 2 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60647, 5,611 issued permit records show a median processing time of 2 days; 75% were issued within 28 days and 90% within 97 days, covering January 2021 through September 15, 2026.
The median was 5 days slower than the previous 12 months.
Permit processing times in ZIP 60647: wait distribution
For Permit processing times in ZIP 60647, 5,611 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60647: annual permit timing
Permit processing times in ZIP 60647 has 6 publishable issue-year cohorts spanning 2021–2026, representing 5,611 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 1,168 | 0 days | 10 days | 72 days |
| 2022 | 1,062 | 0 days | 9 days | 76 days |
| 2023 | 917 | 0 days | 13 days | 78 days |
| 2024 | 937 | 9 days | 40 days | 105 days |
| 2025 | 876 | 9 days | 45 days | 114 days |
| 2026* | 651 | 13 days | 48 days | 130 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60647: ZIP codes with similar overall timing
Permit processing times in ZIP 60647 has 5,611 issued records, a 2 days median, and a 28 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60647 comparisons
The Permit processing times in ZIP 60647 cohort contains 5,611 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayRenovation & Alteration 35 daysEasy Permit Process 0 daysSigns 27 daysNew Construction 42 daysWrecking & Demolition 0 daysElevator Equipment 0 daysReinstated Permit 0 days