Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

New Construction permits in ZIP 60619

The median new construction permit wait in ZIP 60619 was 44 days, based on 43 issued records.

Records checked432021–Sep. 15, 2026

The short answer

Typical wait44 daysmedian issued permit
Usually within108 days75% of records
Long-wait edge271 days90% of records
Evidence43issued permits

Not enough records for a year-over-year comparison.

How the waits are distributed

Median is only the middle. This shows how often issued permits fell into each elapsed-time band.

Same day
37.2%
1–7 days
7.0%
8–30 days
4.7%
31–90 days
18.6%
91+ days
32.6%

Change over time

Annual permit timing

Issue yearRecordsMedian75th percentile90th percentile
2022100 days2.2 days102 days
20241288 days107 days120 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

New Construction timing in comparable ZIP codes

ReportMedian75% withinRecords
ZIP 6061944 days108 days43
ZIP 6061845 days86 days503
ZIP 6062345 days146 days253
ZIP 6062142 days137 days36
ZIP 6064742 days105 days322
ZIP 6062941 days116 days45
ZIP 6061648 days128 days190
ZIP 6062040 days97 days39