ZIP code × permit type
Signs permits in ZIP 60609
The median signs permit wait in ZIP 60609 was 20 days, based on 217 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60609, 217 issued permit records show a median processing time of 20 days; 75% were issued within 79 days and 90% within 151 days, covering January 2021 through September 15, 2026.
The median was 96 days slower than the previous 12 months.
Signs permits in ZIP 60609: wait distribution
For Signs permits in ZIP 60609, 217 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60609: annual permit timing
Signs permits in ZIP 60609 has 5 publishable issue-year cohorts spanning 2021–2026, representing 211 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 65 | 8 days | 53 days | 119 days |
| 2022 | 34 | 6.5 days | 53 days | 129 days |
| 2023 | 34 | 15 days | 97 days | 112 days |
| 2025 | 52 | 35 days | 78 days | 148 days |
| 2026* | 26 | 17 days | 200 days | 313 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60609: Signs timing in comparable ZIP codes
Signs permits in ZIP 60609 has 217 issued records, a 20 days median, and a 79 days 75th-percentile wait in this release.
More Signs permits in ZIP 60609 comparisons
The Signs permits in ZIP 60609 cohort contains 217 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60609 permits ZIP reportSigns citywide Type report