ZIP code × permit type
Signs permits in ZIP 60641
The median signs permit wait in ZIP 60641 was 20 days, based on 384 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60641, 384 issued permit records show a median processing time of 20 days; 75% were issued within 44 days and 90% within 166 days, covering January 2021 through September 15, 2026.
The median was 11 days faster than the previous 12 months.
Signs permits in ZIP 60641: wait distribution
For Signs permits in ZIP 60641, 384 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60641: annual permit timing
Signs permits in ZIP 60641 has 6 publishable issue-year cohorts spanning 2021–2026, representing 384 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 90 | 9.5 days | 37 days | 89 days |
| 2022 | 67 | 10 days | 40 days | 292 days |
| 2023 | 83 | 12 days | 21 days | 46 days |
| 2024 | 52 | 33 days | 140 days | 189 days |
| 2025 | 47 | 27 days | 52 days | 87 days |
| 2026* | 45 | 24 days | 48 days | 76 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60641: Signs timing in comparable ZIP codes
Signs permits in ZIP 60641 has 384 issued records, a 20 days median, and a 44 days 75th-percentile wait in this release.
More Signs permits in ZIP 60641 comparisons
The Signs permits in ZIP 60641 cohort contains 384 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60641 permits ZIP reportSigns citywide Type report