Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60660

The median signs permit wait in ZIP 60660 was 20 days, based on 102 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1022021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60660, 102 issued permit records show a median processing time of 20 days; 75% were issued within 56 days and 90% within 121 days, covering January 2021 through September 15, 2026.

Typical wait20 daysmedian issued permit
Usually within56 days75% of records
Long-wait edge121 days90% of records
Evidence102issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60660: wait distribution

For Signs permits in ZIP 60660, 102 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
3.9%
1–7 days
35.3%
8–30 days
16.7%
31–90 days
29.4%
91+ days
14.7%

Change over time

Signs permits in ZIP 60660: annual permit timing

Signs permits in ZIP 60660 has 5 publishable issue-year cohorts spanning 2021–2025, representing 95 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021213 days7 days21 days
2022237 days68 days256 days
2023133 days9 days52 days
20241550 days90 days168 days
20252356 days56 days62 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60660: Signs timing in comparable ZIP codes

Signs permits in ZIP 60660 has 102 issued records, a 20 days median, and a 56 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6060920 days79 days217
ZIP 6061820 days51 days601
ZIP 6064120 days44 days384
ZIP 6065220 days71 days177
ZIP 6066020 days56 days102
ZIP 6062821 days71 days115
ZIP 6063421 days38 days131
ZIP 6065521 days42 days83