Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60652

The median signs permit wait in ZIP 60652 was 20 days, based on 177 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1772021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60652, 177 issued permit records show a median processing time of 20 days; 75% were issued within 71 days and 90% within 73 days, covering January 2021 through September 15, 2026.

Typical wait20 daysmedian issued permit
Usually within71 days75% of records
Long-wait edge73 days90% of records
Evidence177issued permits

The median was 55 days faster than the previous 12 months.

Signs permits in ZIP 60652: wait distribution

For Signs permits in ZIP 60652, 177 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.0%
1–7 days
22.0%
8–30 days
40.7%
31–90 days
34.5%
91+ days
2.8%

Change over time

Signs permits in ZIP 60652: annual permit timing

Signs permits in ZIP 60652 has 6 publishable issue-year cohorts spanning 2021–2026, representing 177 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021286 days8 days57 days
2022208 days8 days38 days
20232916 days22 days40 days
20241736 days55 days269 days
20254273 days73 days74 days
2026*4118 days20 days24 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60652: Signs timing in comparable ZIP codes

Signs permits in ZIP 60652 has 177 issued records, a 20 days median, and a 71 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6060920 days79 days217
ZIP 6061820 days51 days601
ZIP 6064120 days44 days384
ZIP 6065220 days71 days177
ZIP 6066020 days56 days102
ZIP 6062821 days71 days115
ZIP 6063421 days38 days131
ZIP 6065521 days42 days83