Signs permits in ZIP 60614

The median signs permit wait in ZIP 60614 was 32 days, based on 709 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked7092021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60614, 709 issued permit records show a median processing time of 32 days; 75% were issued within 76 days and 90% within 120 days, covering January 2021 through September 15, 2026.

Typical wait32 daysmedian issued permit
Usually within76 days75% of records
Long-wait edge120 days90% of records
Evidence709issued permits

The median was 11 days faster than the previous 12 months.

Signs permits in ZIP 60614: wait distribution

For Signs permits in ZIP 60614, 709 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.4%
1–7 days
20.2%
8–30 days
29.1%
31–90 days
32.2%
91+ days
18.2%

Change over time

Signs permits in ZIP 60614: annual permit timing

Signs permits in ZIP 60614 has 6 publishable issue-year cohorts spanning 2021–2026, representing 709 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
202111117 days84 days123 days
20221368.5 days60 days122 days
20231006.5 days48 days86 days
202416845 days78 days148 days
202513546 days73 days108 days
2026*5938 days68 days121 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60614: Signs timing in comparable ZIP codes

Signs permits in ZIP 60614 has 709 issued records, a 32 days median, and a 76 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6061432 days76 days709
ZIP 6062432 days78 days99
ZIP 6065432 days91 days465
ZIP 6060732 days81 days812
ZIP 6061034 days59 days379
ZIP 6061130 days63 days572
ZIP 6062930 days81 days209
ZIP 6061629 days74 days205