ZIP code × permit type
Signs permits in ZIP 60607
The median signs permit wait in ZIP 60607 was 32 days, based on 812 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60607, 812 issued permit records show a median processing time of 32 days; 75% were issued within 81 days and 90% within 174 days, covering January 2021 through September 15, 2026.
The median was 13 days slower than the previous 12 months.
Signs permits in ZIP 60607: wait distribution
For Signs permits in ZIP 60607, 812 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60607: annual permit timing
Signs permits in ZIP 60607 has 6 publishable issue-year cohorts spanning 2021–2026, representing 812 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 136 | 73 days | 184 days | 390 days |
| 2022 | 127 | 12 days | 38 days | 90 days |
| 2023 | 198 | 18 days | 52 days | 136 days |
| 2024 | 119 | 45 days | 79 days | 181 days |
| 2025 | 135 | 35 days | 90 days | 134 days |
| 2026* | 97 | 55 days | 81 days | 120 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60607: Signs timing in comparable ZIP codes
Signs permits in ZIP 60607 has 812 issued records, a 32 days median, and a 81 days 75th-percentile wait in this release.
More Signs permits in ZIP 60607 comparisons
The Signs permits in ZIP 60607 cohort contains 812 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60607 permits ZIP reportSigns citywide Type report