Signs permits in ZIP 60610
The median signs permit wait in ZIP 60610 was 34 days, based on 379 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60610, 379 issued permit records show a median processing time of 34 days; 75% were issued within 59 days and 90% within 105 days, covering January 2021 through September 15, 2026.
The median was 12 days faster than the previous 12 months.
Signs permits in ZIP 60610: wait distribution
For Signs permits in ZIP 60610, 379 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60610: annual permit timing
Signs permits in ZIP 60610 has 6 publishable issue-year cohorts spanning 2021–2026, representing 379 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 53 | 55 days | 94 days | 134 days |
| 2022 | 82 | 20 days | 66 days | 131 days |
| 2023 | 69 | 7 days | 43 days | 99 days |
| 2024 | 85 | 35 days | 48 days | 64 days |
| 2025 | 65 | 41 days | 74 days | 75 days |
| 2026* | 25 | 38 days | 57 days | 163 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60610: Signs timing in comparable ZIP codes
Signs permits in ZIP 60610 has 379 issued records, a 34 days median, and a 59 days 75th-percentile wait in this release.
More Signs permits in ZIP 60610 comparisons
The Signs permits in ZIP 60610 cohort contains 379 issued records; related links retain separate location and permit-category cohorts.