Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60625

The median signs permit wait in ZIP 60625 was 37 days, based on 266 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2662021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60625, 266 issued permit records show a median processing time of 37 days; 75% were issued within 128 days and 90% within 178 days, covering January 2021 through September 15, 2026.

Typical wait37 daysmedian issued permit
Usually within128 days75% of records
Long-wait edge178 days90% of records
Evidence266issued permits

The median was 72 days faster than the previous 12 months.

Signs permits in ZIP 60625: wait distribution

For Signs permits in ZIP 60625, 266 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
1.1%
1–7 days
10.9%
8–30 days
33.5%
31–90 days
21.1%
91+ days
33.5%

Change over time

Signs permits in ZIP 60625: annual permit timing

Signs permits in ZIP 60625 has 6 publishable issue-year cohorts spanning 2021–2026, representing 266 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
202128100 days120 days269 days
20222917 days110 days362 days
2023285 days22 days98 days
20245322 days48 days90 days
202596106 days178 days178 days
2026*3241 days66 days203 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60625: Signs timing in comparable ZIP codes

Signs permits in ZIP 60625 has 266 issued records, a 37 days median, and a 128 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6062537 days128 days266
ZIP 6061034 days59 days379
ZIP 6060732 days81 days812
ZIP 6061432 days76 days709
ZIP 6062432 days78 days99
ZIP 6065432 days91 days465
ZIP 6060143 days83 days175
ZIP 6061130 days63 days572