ZIP boundary report
Permit processing times in ZIP 60625
Across 4,348 issued permits assigned to ZIP 60625, the median processing time was 1 day.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60625, 4,348 issued permit records show a median processing time of 1 day; 75% were issued within 20 days and 90% within 78 days, covering January 2021 through September 15, 2026.
The median was unchanged from the previous 12 months.
Permit processing times in ZIP 60625: wait distribution
For Permit processing times in ZIP 60625, 4,348 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60625: annual permit timing
Permit processing times in ZIP 60625 has 6 publishable issue-year cohorts spanning 2021–2026, representing 4,348 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 805 | 0 days | 7 days | 54 days |
| 2022 | 850 | 0 days | 6 days | 60 days |
| 2023 | 739 | 0 days | 12 days | 62 days |
| 2024 | 727 | 5 days | 26 days | 73 days |
| 2025 | 739 | 9 days | 38 days | 150 days |
| 2026* | 488 | 7.5 days | 43 days | 113 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60625: ZIP codes with similar overall timing
Permit processing times in ZIP 60625 has 4,348 issued records, a 1 day median, and a 20 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60625 comparisons
The Permit processing times in ZIP 60625 cohort contains 4,348 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayRenovation & Alteration 33 daysEasy Permit Process 0 daysSigns 37 daysNew Construction 15 daysWrecking & Demolition 0 daysElevator Equipment 0 daysReinstated Permit 0 days