ZIP boundary report
Permit processing times in ZIP 60603
Across 1,858 issued permits assigned to ZIP 60603, the median processing time was 1 day.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60603, 1,858 issued permit records show a median processing time of 1 day; 75% were issued within 13 days and 90% within 41 days, covering January 2021 through September 15, 2026.
The median was 1 day slower than the previous 12 months.
Permit processing times in ZIP 60603: wait distribution
For Permit processing times in ZIP 60603, 1,858 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60603: annual permit timing
Permit processing times in ZIP 60603 has 6 publishable issue-year cohorts spanning 2021–2026, representing 1,858 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 373 | 0 days | 4 days | 26 days |
| 2022 | 382 | 0 days | 5.8 days | 35 days |
| 2023 | 320 | 1 day | 15 days | 43 days |
| 2024 | 290 | 3 days | 18 days | 45 days |
| 2025 | 313 | 5 days | 18 days | 57 days |
| 2026* | 180 | 4 days | 12 days | 48 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60603: ZIP codes with similar overall timing
Permit processing times in ZIP 60603 has 1,858 issued records, a 1 day median, and a 13 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60603 comparisons
The Permit processing times in ZIP 60603 cohort contains 1,858 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayRenovation & Alteration 4 daysElevator Equipment 0 daysEasy Permit Process 0 daysSigns 45 daysScaffolding 0 daysNew Construction 0 days