Elevator Equipment permits in ZIP 60603
The median elevator equipment permit wait in ZIP 60603 was 0 days, based on 147 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Elevator Equipment permits in ZIP 60603, 147 issued permit records show a median processing time of 0 days; 75% were issued within 5 days and 90% within 7 days, covering January 2021 through September 15, 2026.
The median was 6.5 days slower than the previous 12 months.
Elevator Equipment permits in ZIP 60603: wait distribution
For Elevator Equipment permits in ZIP 60603, 147 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Elevator Equipment permits in ZIP 60603: annual permit timing
Elevator Equipment permits in ZIP 60603 has 6 publishable issue-year cohorts spanning 2021–2026, representing 147 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 26 | 0 days | 0 days | 3 days |
| 2022 | 17 | 0 days | 0 days | 6.4 days |
| 2023 | 17 | 2 days | 5 days | 7 days |
| 2024 | 27 | 0 days | 0 days | 4.4 days |
| 2025 | 43 | 0 days | 7 days | 7 days |
| 2026* | 17 | 5 days | 7 days | 7 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Elevator Equipment permits in ZIP 60603: Elevator Equipment timing in comparable ZIP codes
Elevator Equipment permits in ZIP 60603 has 147 issued records, a 0 days median, and a 5 days 75th-percentile wait in this release.
More Elevator Equipment permits in ZIP 60603 comparisons
The Elevator Equipment permits in ZIP 60603 cohort contains 147 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60603 permits ZIP reportElevator Equipment citywide Type report