Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Elevator Equipment permits in ZIP 60606

The median elevator equipment permit wait in ZIP 60606 was 0 days, based on 240 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2402021–Sep. 15, 2026

The short answer

For Elevator Equipment permits in ZIP 60606, 240 issued permit records show a median processing time of 0 days; 75% were issued within 5 days and 90% within 7 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within5 days75% of records
Long-wait edge7 days90% of records
Evidence240issued permits

The median was 2 days slower than the previous 12 months.

Elevator Equipment permits in ZIP 60606: wait distribution

For Elevator Equipment permits in ZIP 60606, 240 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
67.5%
1–7 days
26.2%
8–30 days
5.4%
31–90 days
0.8%
91+ days
0.0%

Change over time

Elevator Equipment permits in ZIP 60606: annual permit timing

Elevator Equipment permits in ZIP 60606 has 6 publishable issue-year cohorts spanning 2021–2026, representing 240 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021440 days0 days7 days
2022300 days0 days5.9 days
2023450 days0 days5 days
2024410 days5 days8 days
2025460 days6 days7 days
2026*342 days5 days7 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Elevator Equipment permits in ZIP 60606: Elevator Equipment timing in comparable ZIP codes

Elevator Equipment permits in ZIP 60606 has 240 issued records, a 0 days median, and a 5 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 606010 days5 days290
ZIP 606020 days5 days113
ZIP 606030 days5 days147
ZIP 606040 days0 days90
ZIP 606050 days4 days187
ZIP 606060 days5 days240
ZIP 606070 days1 day240
ZIP 606080 days0 days146