Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60603

The median signs permit wait in ZIP 60603 was 45 days, based on 77 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked772021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60603, 77 issued permit records show a median processing time of 45 days; 75% were issued within 100 days and 90% within 168 days, covering January 2021 through September 15, 2026.

Typical wait45 daysmedian issued permit
Usually within100 days75% of records
Long-wait edge168 days90% of records
Evidence77issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60603: wait distribution

For Signs permits in ZIP 60603, 77 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
1.3%
1–7 days
10.4%
8–30 days
27.3%
31–90 days
26.0%
91+ days
35.1%

Change over time

Signs permits in ZIP 60603: annual permit timing

Signs permits in ZIP 60603 has 4 publishable issue-year cohorts spanning 2022–2025, representing 66 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20223328 days73 days145 days
2023119 days65 days69 days
20241067 days97 days129 days
202512100 days130 days366 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60603: Signs timing in comparable ZIP codes

Signs permits in ZIP 60603 has 77 issued records, a 45 days median, and a 100 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6060345 days100 days77
ZIP 6060544 days116 days190
ZIP 6060143 days83 days175
ZIP 6060450 days84 days28
ZIP 6062537 days128 days266
ZIP 6060255 days63 days115
ZIP 6061034 days59 days379
ZIP 6060732 days81 days812