Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60605

The median signs permit wait in ZIP 60605 was 44 days, based on 190 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1902021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60605, 190 issued permit records show a median processing time of 44 days; 75% were issued within 116 days and 90% within 255 days, covering January 2021 through September 15, 2026.

Typical wait44 daysmedian issued permit
Usually within116 days75% of records
Long-wait edge255 days90% of records
Evidence190issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60605: wait distribution

For Signs permits in ZIP 60605, 190 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
6.3%
1–7 days
8.9%
8–30 days
22.6%
31–90 days
33.7%
91+ days
28.4%

Change over time

Signs permits in ZIP 60605: annual permit timing

Signs permits in ZIP 60605 has 5 publishable issue-year cohorts spanning 2021–2025, representing 181 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20212797 days398 days532 days
20222943 days212 days286 days
20235016 days71 days85 days
20244443 days133 days227 days
20253150 days89 days165 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60605: Signs timing in comparable ZIP codes

Signs permits in ZIP 60605 has 190 issued records, a 44 days median, and a 116 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6060544 days116 days190
ZIP 6060345 days100 days77
ZIP 6060143 days83 days175
ZIP 6060450 days84 days28
ZIP 6062537 days128 days266
ZIP 6060255 days63 days115
ZIP 6061034 days59 days379
ZIP 6060732 days81 days812