ZIP code × permit type
Signs permits in ZIP 60602
The median signs permit wait in ZIP 60602 was 55 days, based on 115 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60602, 115 issued permit records show a median processing time of 55 days; 75% were issued within 63 days and 90% within 107 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in ZIP 60602: wait distribution
For Signs permits in ZIP 60602, 115 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60602: annual permit timing
Signs permits in ZIP 60602 has 5 publishable issue-year cohorts spanning 2022–2026, representing 106 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2022 | 23 | 19 days | 28 days | 126 days |
| 2023 | 36 | 63 days | 63 days | 63 days |
| 2024 | 11 | 55 days | 55 days | 55 days |
| 2025 | 23 | 22 days | 88 days | 143 days |
| 2026* | 13 | 80 days | 106 days | 125 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60602: Signs timing in comparable ZIP codes
Signs permits in ZIP 60602 has 115 issued records, a 55 days median, and a 63 days 75th-percentile wait in this release.
More Signs permits in ZIP 60602 comparisons
The Signs permits in ZIP 60602 cohort contains 115 issued records; related links retain separate location and permit-category cohorts.